Platform

Four products on the same database. Each can be contracted on its own. Together, they use the same information and do not repeat work.

One database, four products

The database brings together, read-only, the systems the operation already uses and the Agnaris Campo records, and checks the data every day. Clima, Perdas and Fornecedor work on top of it. Whoever starts with one product reuses the database in the next.

Agnaris Clima

Rain and calendar turned into operating decisions.

On which days will the rain stop the field, and what should be done before it?

Who it is forSugar mills, fruit farms, dairies and growers who plan cutting, harvest, planting or irrigation around rain.

  1. History

    Before recommending anything, we look at the rain from your rain gauges in previous seasons and the days on which the operation stopped.

  2. Forecast

    Every day, the weather forecast goes into the model and becomes days of stopped operation by farm or front, over the next 7 days.

  3. Recommendation

    Whoever makes the call receives what to do before the rain: where to bring forward cutting or harvest, how much cane to keep available, when to schedule maintenance.

Data used
  • Rain gauges and weather stations of the operation
  • Numerical weather forecasts
  • Stoppage and production history
  • Soil and terrain of each farm
Deliverables
  • Days of stopped operation by farm or front, over the next 7 days
  • What to bring forward, hold back or schedule before the rain
Learn about Agnaris Clima
Agnaris Clima Forecast by farm Next 7 days
Rain forecast by farm, with non-workable days highlighted (illustrative)
FarmMonTueWedThuFriSatSun
Farm 03Hillside, front 1 1 4 19 27 9 2 0
Farm 07Floodplain, front 2 1 5 22 30 12 4 1
Farm 11Hillside, front 1 0 3 15 24 8 2 0
Farm 12Tableland, front 3 0 2 9 18 5 1 0
Farm 14Tableland, front 3 0 2 8 16 4 1 0
WorkableNon-workable (above 10 mm)mm per day
Forecast days with cutting stopped
2
Recommended available cane
20 h of crushing
Suggested cutting order
Farm 14, 12, 03
Sample screen, illustrative data

Agnaris Perdas

Where the operation loses raw material and sugar, from the field to the plant.

How much is lost between the field and the plant, at what stage and why?

Who it is forPlants that receive raw material from many fronts, lots or routes and need to know where and why they lose quality and product.

  1. Record

    Each load, lot or collection is linked to its area of origin, the time of burning or harvest, transport and arrival.

  2. Balance

    Weighbridge, laboratory and plant bulletin close the account by stage and shift, separating known loss from unaccounted loss.

  3. Alert

    When a front goes past the time limit, a lot loses its grade or a meter stops balancing, the team is notified in the same shift.

Data used
  • Burning, harvest and transport records
  • Weighbridge and laboratory
  • Plant bulletin and systems
  • Map of the source areas
Deliverables
  • Time and quality loss by front, lot or route
  • Balance by stage and shift, with the unaccounted loss
  • Meters out of calibration and calculated values where there is no measurement
Learn about Agnaris Perdas
Agnaris Perdas Loads in the shift Today, 06:00 to 14:00
Loads in the shift with time between burning and weighbridge, and quality (illustrative)
LoadFarmBurningWeighbridgeTimeATR
4471Farm 14Tue 14:10Wed 09:42 19 h 32 136.8
4472Farm 14Tue 14:10Wed 10:05 19 h 55 137.2
4473Farm 09Mon 20:30Wed 10:48 38 h 18 131.4
4474Farm 12Tue 16:40Wed 11:02 18 h 22 135.9
4475Farm 09Mon 20:30Wed 11:31 39 h 01 130.7

Front 2 (farm 09): loads more than 36 h past burning. ATR 4% below the other fronts.

Sample screen, illustrative data

Agnaris Campo

Field records on the phone, with or without internet.

What happened on each front today, and at what time?

Who it is forOperations where the weighbridge only records weight, the rain stays in a notebook and the time of burning, harvest or collection never reaches anyone.

  1. Setup

    Farms, fronts, lots, routes and trucks are entered once. Each role sees only what it records.

  2. Record

    In the field, two taps record the burning, cutting, harvest, collection or rain gauge reading, with time and place, even without signal.

  3. Use

    The records reach the database when the signal returns and start feeding the weighbridge, Clima and Perdas.

Data used
  • Field team phones, with or without signal
  • List of farms, fronts and blocks
  • Rain gauges and trucks of the operation
  • Cutting, harvest or collection orders
Deliverables
  • Burning, cutting, harvest and loading with time and place
  • Rain gauge readings on the same day
  • Data ready for Clima and Perdas
Learn about Agnaris Campo
Agnaris Campo Today's records Synced at 14:20
  1. 07:05 Rain gauge at farm 14: 0 mmSupervisor, front 1 Sent
  2. 07:12 Rain gauge at farm 2: 18 mmSupervisor, front 2 Sent
  3. 09:40 Loading at farm 14, front 1Driver, truck 12 Sent
  4. 13:55 Cutting started in block 21Supervisor, front 3 Waiting for signal
  5. 14:10 Burning of block 14Supervisor, front 2 Sent
Records today
146
Waiting for signal
1
Rain gauges read
9 of 10
Sample screen, illustrative data

Agnaris Fornecedor

Payment for quality checked load by load.

Does what was paid to each supplier match the weight and quality of what they delivered?

Who it is forGrowers' associations, cooperatives and plants that pay for quality and want an account both sides can check.

  1. Rules

    We register the payment rules in force, such as Consecana, the dairy's table or the packing house's, and the history of each area.

  2. Checking

    Each load, collection or lot is checked: weight, analysis, deductions and amount paid. Anything outside the history is flagged.

  3. Statement

    Each supplier receives a statement with the reason for every amount, and the association follows the flagged analyses.

Data used
  • Weight and analysis of each load or collection
  • Payment rules: Consecana, the dairy's or the packing house's table
  • Register of suppliers and areas
  • Production costs by region
Deliverables
  • Payment checked load by load
  • Out-of-range analyses flagged for follow-up
  • Simulation of the amount to be received and comparison with cost
Learn about Agnaris Fornecedor
Agnaris Fornecedor Fortnight check Fortnight 14, 2026/27 season
Check of the fortnight's loads, with measured ATR and history range (illustrative)
LoadSupplierWeightATRHistoryStatus
8812039831.2 t 132.4128 to 136 Within history
8815041229.8 t 112.0126 to 135 Outside the range
8817015530.5 t 129.8125 to 133 Within history
8820041230.1 t 114.6126 to 135 Outside the range
8824023028.9 t 134.1129 to 137 Within history

Supplier 0412: 2 analyses below the area's history, with 4 mm of rain in the week. Watch the next sample.

Sample screen, illustrative data

What you need to get started

  1. History

    At least one season of data: crushing or production, stoppages and, if available, rain and quality. A spreadsheet is fine.

  2. Access

    Exports or read access to the systems that hold this data. We change nothing in them.

  3. One person

    Someone from the operation who knows the data and can answer the technical team's questions a few hours a week.

Frequently asked questions

Do I need to replace the systems I already use?

No. Agnaris reads data from the existing systems and works alongside them.

Do I need to install sensors?

Not to start. The diagnostic uses the data the operation already records. If the analysis shows a measurement is missing, we say which one and where.

Does the data stay mine?

Yes. The contract defines where it is stored, who has access and what happens to it when the contract ends, in line with the LGPD (Brazil's General Data Protection Law).

How long until the first deliverable?

The diagnostic with your data takes 4 to 6 weeks, depending on the volume and organization of the information.

How is it priced?

The diagnostic has a fixed price, set by the size of the operation, and is covered by a confidentiality agreement. The implementation proposal comes after it, with the estimated gain and the assumptions used; the price depends on the size of the operation and the products contracted.

Talk to the team

Tell us what your operation produces and what data it already has. The first conversation is with the technical team.